AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Mar 16, 2018

AD: Airbus Airplanes

AD NUMBER: 2018-06-03

PRODUCT: Certain Airbus Model A310-203, -204, -221, -222, -304, -322, -324, and -325 airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2009-18-16, which applied to the aircraft listed above. AD 2009-18-16 required an inspection for cracking of certain fastener holes on certain frames, and related investigative and corrective actions if necessary; and modification of certain fastener holes.

This new AD reduces the compliance times. This AD was prompted by the identification of a structural modification that falls within the scope of the work related to the extension of the service life of the affected airplanes and widespread fatigue damage evaluations.

DATES: This AD is effective April 19, 2018.

COST: The FAA estimates that this AD affects 8 airplanes of U.S. registry. It will take about 41 work-hours per product to comply with the basic requirements of this AD. The average labor rate is $85 per work-hour. Required parts will cost about $20,180 per product. Based on these figures, the estimated cost of this AD on U.S. operators to be $189,320, or $23,665 per product.

Although no definitive data has been received that will enable the FAA to provide cost estimates for the on-condition actions (i.e., additional inspection and modification for certain airplanes) specified in this AD, it has been determined that the total repair costs could be up to $10,000 per product. The FAA has no way of determining the number of aircraft that might need these repairs.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC