AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sun, May 12, 2013

AD: The Boeing Company Airplanes

AD NUMBER: 2013-09-02

PRODUCT: Certain Boeing Model 737-100, -200, -200C, -300, -400, and -500 series airplanes.
SUBJECT: Airworthiness Directive 2013-09-02
ACTION: Final Rule

SUMMARY: The FAA is superseding two existing airworthiness directives (AD) that apply to the products listed above. Those ADs, for certain airplanes, currently require repetitive inspections of the flap track of the wing outboard flap, and corrective actions if necessary; and eventual rework of the flap track assembly and rear spar attachments.

For certain airplanes, this new AD adds repetitive inspections, scheduled overhauls, correct alignment during installation, and repetitive maintenance of the flap track, and corrective actions if necessary. This new AD also adds airplanes to the applicability. This AD was prompted by reports that the work sequence and procedures used during installation of replacement tracks could cause loose or cracked tracks. The FAA is issuing this AD to detect and correct cracking and damage in the flap track, which could cause loss of the outboard trailing edge flap and consequent reduced controllability of the airplane.

DATES: This AD is effective June 13, 2013.

FMI: AD
 

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC