North Dakota Wind Farm Being Evaluated For Airport Impacts | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Thu, Dec 06, 2018

North Dakota Wind Farm Being Evaluated For Airport Impacts

Proposed Project Is 12 To 13 Miles From The Bismarck Airport

A wind farm project proposed for a location 15 miles southeast of Bismarck, ND is being evaluated for potential impacts on airport operations at Bismarck Municipal Airport (KBIS).

The Bismarck Tribune reports that the wind farm developers have reduced the height of some of the turbines planned for the project to accommodate concerns expressed by pilots who use the airport. Chicago-based Pure New Energy USA says it has coordinated with the FAA and the airport during its planning process, which has led to the adjustments.

After those adjustment were made, the FAA determined that there would be no substantial impact on air navigation caused by the wind farm, provided that the turbines are properly lighted and marked. But Bismarck Airport Director Greg Haug said that he still has questions about possible interference with airport surveillance radar.

The proposed project is for between 65 and 75 wind turbines on 15,000 acres in southern Burleigh County that would produce 250 megawatts of electricity. The turbines would be between 450 and 570 feet tall.

Proponents cite economic benefits for the county from the project, while opponents, apart from the airport concerns, say it will be unsightly. Bismarck Mayor Steve Bakken, who also serves on the Bismarck Planning Commission, said that no matter which way the vote goes, there will likely be an appeal.

A planning commission meeting was set for Wednesday. The Burleigh County Commission is also expected to hold a public hearing on the project.

(Image from file)

FMI: Source report

Advertisement

More News

ANN's Daily Aero-Term (05.17.24): Very High Frequency

Very High Frequency The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/ground voi>[...]

ANN's Daily Aero-Linx (05.17.24)

Aero Linx: Aviation Suppliers Association Established February 25, 1993, the Aviation Suppliers Association (ASA), based in Washington, D.C., is a not-for-profit association, repre>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: ANN Visits Wings Over The Rockies Exploration Of Flight

From 2021 (YouTube Version): Colorado Campus Offers aVariety Of Aerospace Entertainment And Education Wings over the Rockies Exploration of Flight is the second location for the Wi>[...]

Airborne Affordable Flyers 05.16.24: PRA Runway, Wag-Aero Sold, Young Eagles

Also: Paramotor Champ's, Electric Ultralight, ICON BK Update, Burt Rutan at Oshkosh! The Popular Rotorcraft Association is reaching out for help in rebuilding their private runway >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC