Work Resumes At Launch Pad 39A | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Wed, Mar 16, 2011

Work Resumes At Launch Pad 39A

Operations Suspended Briefly After A Worker Was Fatally Injured In A Fall Monday

Technicians at NASA Kennedy Space Center's Launch Pad 39A resumed processing operations Tuesday in preparation for space shuttle Endeavour's upcoming launch.

NASA and United Space Alliance managers met with pad workers in the morning who expressed a desire to continue shuttle processing following the unexpected death of a co-worker at the pad Monday morning.

Crews will perform checks on the power reactant storage distribution system, or PRSD, and the external fuel tank's camera. The PRSD holds super-cold liquid oxygen and liquid hydrogen for use by the shuttle's three fuel cells to produce electricity during flight. The fuel cells combine the chemicals to generate electricity. Water is a byproduct of the process and astronauts typically transfer that water to the space station during the mission.

Endeavour is targeted to launch on its STS-134 mission to the International Space Station on April 19

FMI: www.nasa.gov

Advertisement

More News

Unfortunate... ANN/SportPlane Resource Guide Adds To Cautionary Advisories

The Industry Continues to be Rocked By Some Questionable Operations Recent investigations and a great deal of data has resulted in ANN’s SportPlane Resource Guide’s rep>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

ANN's Daily Aero-Term (04.29.24): Visual Approach Slope Indicator (VASI)

Visual Approach Slope Indicator (VASI) An airport lighting facility providing vertical visual approach slope guidance to aircraft during approach to landing by radiating a directio>[...]

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC