Tavares, FL Officials Hope To Reopen Seaplane Base Next Year | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Jun 03, 2019

Tavares, FL Officials Hope To Reopen Seaplane Base Next Year

Facility Was Destroyed By Hurricane Irma In 2017

Tavares, FL officials hope to have the city's signature seaplane base back in operation by fall 2020, and say the rebuilding project is on "hyper speed".

The Daily Commercial newspaper reports that the project came up during a recent city meeting to discuss the construction of a proposed performing arts center. Some residents expressed concerns about how long some city projects take to complete, with the seaplane docks at the top of their list.

The seaplane base was destroyed by Hurricane Irma in September 2017. The storm pulled up docks and walkways, leaving little in its wake. The city did not secure a contractor to rebuild the facility until the spring of 2018, and is still working with its insurance company to secure funding for the project.

City Administrator John Drury said that for any large municipal project, it takes a year to decide whether to do the project, a year to find the money, a year to design, engineer and permit the project, and a year to actually build it. And that's when it is on a fast track.

While the docks for the seaplane base should be opened next year, but a complete rebuilding of the facility is still about two years out. Infrastructure to support boats and airplanes will be further apart for safety reasons, and the fueling system will be modified to compliment other updates. Water, sewer pump-outs and electric service is also being rebuilt.

(Image from file)

FMI: Source report

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC