Orion Takes Big Step Before Moving To The Launch Pad | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Nov 06, 2014

Orion Takes Big Step Before Moving To The Launch Pad

Ogive Panels Installed To Reduce Drag, Absorb Vibrations

The 80-foot high Orion spacecraft being readied for its December flight test now sports four recently-installed protective panels that make up the Ogive. The Ogive reduces drag and acoustic load on the crew module, making it a smoother ride for the spacecraft.

“What my colleagues and I were able to witness was a significant historical point in our efforts to move beyond low-Earth orbit and explore past the moon,” said Kevin Rivers, Launch Abort System project manager, after seeing the spacecraft.

On Dec. 4, Orion is scheduled to launch atop a United Launch Alliance Delta IV Heavy rocket from Cape Canaveral Air Force Station’s Space Launch Complex 37 in Florida. During the test, Orion will travel 3,600 miles in altitude above Earth. 4 1/2 hours later, the spacecraft will reenter the atmosphere at 20,000 mph and splash down in the Pacific Ocean. Orion’s first flight will verify launch and high-speed reentry systems such as avionics, attitude control, parachutes and the heat shield.

Barry Meredith, who works with Rivers at NASA’s Langley Research Center in Virginia, expressed a similar awe. “Orion’s flight test is a major step toward exploring beyond low-Earth orbit,” he said. “Though a crew will not occupy the first flight, it’s really critical that we test the spacecraft systems.”

The Ogive installation was one of the last pieces of the puzzle for Orion prior to its move to the launch pad on Nov. 10. There, it will be lifted and attached to the rocket for its December launch.

“There is much effort and preparation for such a momentous occasion,” said Langley engineer Jose Ortiz. “There are many disciplines, geographically dispersed specialties and developments, tests, elaborate analyses, materials characterizations, and other efforts by NASA centers and contractor partners. The nationwide effort is aimed toward one common and challenging goal in mind: human spaceflight.”

Orion is managed out of NASA’s Johnson Space Flight Center in Texas, and the Launch Abort System project is managed out of Langley. NASA centers and industry partners from across the country have also played a critical role in the design, development and testing of Orion.

(Image provided by NASA. Inside the Launch Abort System Facility at NASA’s Kennedy Space Center in Florida, a crane brings the fourth and final Ogive panel closer for installation on Orion's Launch Abort System. The panels will smooth the airflow over the conical spacecraft to limit sound and vibration)

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC