US Navy Awards $2.5 Billion Contract For 20 More P-8A Poseidon Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Feb 03, 2016

US Navy Awards $2.5 Billion Contract For 20 More P-8A Poseidon Aircraft

Order Expands Navy Maritime Surveillance Fleet, Includes Four Aircraft For Australia

Boeing will further equip the U.S. Navy and Royal Australian Air Force (RAAF) with maritime patrol capabilities, building 20 more P-8A Poseidon aircraft following a $2.5 billion U.S. Navy order announced yesterday.

The contract, for Lot 7 of the total P-8A program of record, includes 16 aircraft for the U.S. Navy and the next four aircraft for the RAAF. The RAAF’s initial four P-8A aircraft were included in the August 2015 Lot 6 contract award.

“We continue to hear feedback from our Navy customer about the incredible capabilities of the P-8A,” said James Dodd, Boeing vice president and program manager of P-8 Programs. “The deployed squadrons tell us it’s exceeding expectations – we’re looking forward to providing even more capability to the fleet and to Australia.”

This latest award puts Boeing on contract to build 78 Poseidons for the Navy and eight for the Australian fleet, with 33 Poseidons delivered to the U.S. Navy to date. The Lot 7 aircraft will begin delivery in late 2017.

Australia’s participation in the P-8A program began in 2009 when the government signed the first in a series of memorandums of understanding to work with the U.S. Navy on system design and development. The U.S. Navy and the RAAF also established a joint program office that operates at Naval Air Station Patuxent River, Md. The first Australian P-8A will be delivered to the RAAF in late 2016.

(Image provided with Boeing news release)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC