Second Gulfstream G150 Starts Flight Test -- Two Weeks Ahead Of Schedule | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Sep 10, 2005

Second Gulfstream G150 Starts Flight Test -- Two Weeks Ahead Of Schedule

G150 Serial Number 202, Logs More than Five Flight Hours on Maiden Flight

Gulfstream Aerospace has added a second G150 business-jet test aircraft to its flight test program – two weeks ahead of schedule. Gulfstream’s newest business jet, the Gulfstream G150, is expected to enter service in the third quarter of 2006.
 
The second production G150 aircraft, serial number 202, completed its first flight Sept. 2 in Tel Aviv, Israel , flying 5 hours, 30 minutes. During the flight, all aircraft systems were cycled and the test aircraft reached a maximum altitude of 45,000 feet and flew at a maximum speed of Mach 0.865. Gulfstream will use this second aircraft for function and reliability testing, which started on Sunday, September 4.

“The pilots reported G150, serial number 202, flew flawlessly during its maiden flight,” said Pres Henne, senior vice president, programs, engineering and test, Gulfstream.

“Like the first G150 test plane, serial number 201, this second test plane impressed us with its outstanding performance qualities. The G150 is proving to be quite a business jet.”

The first G150 flight-test aircraft, serial number 201, has flown some 70 flights, accumulating more than 250 flight hours since its first flight on May 3 of this year. The aircraft’s dispatch reliability has enabled pilots to fly two test flights per day on many of the days the aircraft has been scheduled to fly. The average flight duration has been more than 3 ½ hours per flight.

Gulfstream and Israel Aircraft Industries (IAI) are developing the wide-cabin, high-speed G150 business jet. It is being built through its Certificate of Airworthiness at IAI’s facility in Tel Aviv and then flown to Gulfstream’s Dallas completions facility for its final phase of manufacturing.

The G150 remains on schedule for type certification in the first quarter of next year. To offer customers a better look at the G150, Gulfstream developed a true-to-size replica of the G150 cabin and cockpit that is currently being displayed in cities throughout the United States.

FMI: www.gulfstreamg150.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC