Atlas Air Worldwide Undertakes GEnx Engine Inspection Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Sep 19, 2012

Atlas Air Worldwide Undertakes GEnx Engine Inspection Program

Has Established A Program To Inspect All Engines Already In Service, Those On The Way

Following the NTSB's recommendation that the FAA issue an AD requiring frequent inspections of GEnx engines on some Dreamliners and 747-8 airplanes, Atlas Air Worldwide Holdings, Inc. issued a statement in response to inquiries about the General Electric GEnx-2B engines serving the company’s Boeing 747-8 Freighter fleet.

"Atlas Air Worldwide’s industry leadership and our operations are based on a deep commitment to and a track record of safety, compliance and security," the company said. "Reflecting our commitment and track record, we have worked closely and continually with General Electric regarding the GEnx-2B engines serving our new Boeing 747-8 Freighters, five of which are currently in service and four of which remain to be delivered to us.

"In conjunction with GE, we established a plan to inspect each of the engines serving our existing 747-8s and will work with GE to inspect the engines that will power our remaining 747-8 deliveries."

The company said that so far, the inspections have not uncovered any issues with its engines, and have not resulted in any loss of flying time by its 747-8 Freighters.

"We have also worked with GE to establish a plan to re-inspect each of our GEnx-2B engines at appropriate intervals," the statement continued. "Future periodic inspections of our GEnx engines are planned to be carried out during regularly scheduled maintenance checks on our 747-8 aircraft. As a result, we do not expect re-inspections of our GEnx engines to disrupt our ability to continue to provide safe, value-added 747-8F service to our customers. As always, reflecting our commitment to and our track record of safety, compliance and security leadership, we will fully comply with any and all directives issued by the Federal Aviation Administration and other regulators with respect to the operation of our aircraft."

FMI: www.atlasair.com

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

ANN's Daily Aero-Linx (05.11.24)

Aero Linx: Pararescue Air Force Pararescuemen, also known as PJs, are the only DoD elite combat forces specifically organized, trained, equipped, and postured to conduct full spect>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC