Aerion Launches Factory Site Selection Process | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sat, Nov 21, 2015

Aerion Launches Factory Site Selection Process

Seeking More Than 100 Acres Near A Major Airport With At Least 9000 Feet Of Runway

Aerion CEO Doug Nichols announced plans for the manufacture of the AS2 supersonic business jet at NBAA on Monday.

“Aerion has begun a formal search for a U.S. manufacturing location,” he said. “We’re looking for a state-of-the art campus of more than 100 acres on a major airport with a minimum 9,000-foot runway, and other special geophysical requirements.” Among them will be a location within 200 nautical miles of a supersonic flight test area, most likely one offshore.

Aerion will evaluate numerous factors including: airport suitability; road and rail infrastructure; proximity to a deep-water port for shipped structures and equipment; local aerospace workforce; state and local regulations; quality of life; and regional educational institutions.

The company expects to announce the location of the assembly site in the first half of 2016 upon formal launch of the AS2 program, and break ground in 2018.

First flight of the Aerion AS2 is planned for 2021 and certification by the FAA in 2023 with entry into service that year.

Airbus Group will provide major components and Aerion will conduct final assembly. Both companies envision a long-term relationship for ongoing technical support. Aerion will draw on expertise from Airbus Group for establishing the new Aerion production facility. “Aerion’s new American home will set the standard for 21st century aerospace manufacturing,” said Nichols.

(Image provided with Aerion news release)

FMI: www.aerionsupersonic.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC