Four Galileo Satellites 'Topped Off' For Milestone Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Oct 30, 2016

Four Galileo Satellites 'Topped Off' For Milestone Launch

Set For Launch On November 15 From French Guiana

Fueling operations have begun with the four Galileo spacecraft to be orbited next month from French Guiana on Arianespace’s first launch that uses its Ariane 5 in deploying Europe’s constellation of navigation satellites.

The fueling activity is now underway in the Spaceport’s S3B payload preparation facility.  One of the first to be processed is named “Antonianna,” after an Italian child who won a European Commission Galileo drawing competition – with one winner selected from each member state of the European Union.

The quartet of Galileo satellites will be deployed by Ariane 5 into circular orbit during a mission lasting just under four hours.

The Ariane 5 launch, designated Flight VA233 in Arianespace’s numbering system, is set for a morning departure from the Spaceport on November 17 at an exact liftoff time of 10:06:48 a.m. in French Guiana (13:06:48 Universal Time – UTC).

Flight VA233 will mark Arianespace’s first use of its heavy-lift Ariane 5 to loft Galileo satellites, following seven previous missions with the company’s medium-lift Soyuz. The Soyuz vehicles carried a pair of Galileo spacecraft on each flight, delivering a total of 14 navigation satellites into orbit since 2011.

Galileo is an important infrastructure program for Europe, creating a civil global satellite navigation system that provides highly accurate positioning with great precision and reliability.

This program is funded and owned by the European Union, with overall responsibility for management and implementation held by the European Commission. The European Space Agency has been assigned design and development of the new generation of systems and infrastructure for Galileo.

(Image provided with Arianespace news release)

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC