Boeing Celebrates Grand Opening Of 777X Composite Wing Center | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, May 24, 2016

Boeing Celebrates Grand Opening Of 777X Composite Wing Center

Investment Of More Than $1 Billion Sustains Thousands Of Puget Sound Jobs

Boeing employees recently joined with community leaders from across the region to celebrate the grand opening of its new 777X Composite Wing Center (CWC) in Everett, WA.

The facility, located on the north side of the main final assembly building, will manufacture the world's largest composite wings for the 777X, the company's newest commercial jetliner, and sustain thousands of Puget Sound area jobs.

Boeing has invested more than $1 billion in the Everett site for construction and outfitting of the new building. "[This] event is bigger than celebrating the opening of a magnificent new building," said Boeing Commercial Airplanes President and CEO Ray Conner. "It's about our employees, and shared success with our partners around the region and in Olympia in keeping the Puget Sound at the forefront of aerospace leadership for decades to come."

Construction of the new CWC building required approximately 4.2 million hours of construction time. At its peak, 1,700 contract employees worked on the project. By the numbers, the new building required:

  • 31,000 tons of steel with the highest beams weighing 720 pounds per foot.
  • 480 miles of electrical cable.
  • 80,000 linear feet of process piping.
  • 170,000 cubic yards of concrete were poured. The concrete was brought to the site by more than 16,500 truckload deliveries.

The CWC is more than 27 acres under one roof – the equivalent to 24 football fields. It will contain three of the world's largest autoclaves – each big enough to fit two Boeing 737 fuselages inside.

To date, the 777X has accumulated 320 orders and commitments from six customers worldwide. Production of the 777X is scheduled to begin in 2017, with first delivery targeted in 2020.

(Source: Boeing news release. Images from file)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC