FAA: LA ARTCC Outage Blamed On Maintenance | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Sep 17, 2004

FAA: LA ARTCC Outage Blamed On Maintenance

The Repairman Was Asleep At The Switch

Tuesday's comm meltdown at the Los Angeles ARTCC facility was caused by the FAA's failure to properly maintain equipment.  So says the FAA itself.

The disruption caused hundreds of flights in and out of Los Angeles, San Diego, other California airports, as well as Las Vegas, to be grounded. 

The problem occurred at the control center that handles high-altitude traffic for the southern California region. 

The FAA says a preliminary investigation found a 30-day maintenance check on the primary radio and voice communications system was never made. 

The system is designed to automatically shut down after a period of time if the maintenance work is not performed. 

There is a backup communications systems, but it failed to work because it wasn't configured properly.  The FAA plans to make adjustments to the radio system to prevent future automatic shut offs in the event maintenance is not completed. The FAA says there were no safety incidents as a result of the shutdown.

In the meantime, the controllers' union, NATCA, said the comm blackout caused at least five near-misses over California and Nevada.

"Three pairs (of planes) were so close that on-board collision avoidance systems were activated," said Mark Sherry, regional vice president of the union and a controller in the San Francisco tower, in an interview with the San Francisco Chronicle. "We had three controllers who couldn't do anything but watch their screens as two dots merged into one, then wait five or six seconds and hope that two came back out."

FMI: www.laartcc.org

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC