AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Nov 13, 2019

AD: The Boeing Company Airplanes

AD NUMBER: 2019-22-01

PRODUCT: Certain The Boeing Company Model 787-8 airplanes.

ACTION: Final rule

SUMMARY:  This AD was prompted by a report of an escapement from the wing spar terminal fitting supplier indicating that the engineering requirements provided by Boeing for controlling machine mismatch were incorrect for part faying surfaces, which can result in a reduced fatigue capability at the interface of the side of body (SOB) rib.

This AD requires repetitive inspections for fatigue cracking and applicable on-condition actions for the SOB rib webs where fastener locations attach the terminal fittings.

DATES: This AD is effective December 17, 2019.

COST: The FAA estimates that this AD affects 1 airplane of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • Inspection: Up to 32 work-hours × $85 per hour = Up to $2,720 per inspection cycle.
  • Parts: $960.
  • Cost per aircraft: Up to $3,680 per inspection cycle.

According to the manufacturer, some or all of the costs of this AD may be covered under warranty, thereby reducing the cost impact on affected individuals.

The FAA does not control warranty coverage for affected individuals. As a result, the FAA has included all known costs in its cost estimate.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (04.26.24): DETRESFA (Distress Phrase)

DETRESFA (Distress Phrase) The code word used to designate an emergency phase wherein there is reasonable certainty that an aircraft and its occupants are threatened by grave and i>[...]

ANN's Daily Aero-Linx (04.26.24)

Aero Linx: The International Association of Missionary Aviation (IAMA) The International Association of Missionary Aviation (IAMA) is comprised of Mission organizations, flight sch>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne-NextGen 04.23.24: UAVOS UVH 170, magni650 Engine, World eVTOL Directory

Also: Moya Delivery Drone, USMC Drone Pilot, Inversion RAY Reentry Vehicle, RapidFlight UAVOS has recently achieved a significant milestone in public safety and emergency services >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC