Copiah County Airport Celebrates New Runway With Nov. 1 Fly-In | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Oct 24, 2014

Copiah County Airport Celebrates New Runway With Nov. 1 Fly-In

First New Runway Constructed In Mississippi In More Than A Decade

The first new runway constructed in more than a decade in the state of Mississippi will be unveiled at a celebratory ribbon cutting and aircraft fly-in at the Copiah County Airport (M11) on Saturday, November 1 at 10 a.m.

The new 4,000 x 75-feet runway, with runway lights and pilot navigational aids, replaces an outdated 3,000-foot runway. Aircraft operators will benefit from the longer length and allows the airport to welcome more complex aircraft, according to Ronnie Barlow, County Administrator.

“Not only has our safety and operational capacity been improved with this new runway, but the economic impact opportunities to enhance our communities and county will have a tremendous long-term benefit.” he explained.

An airport fly-in will be hosted by the County and Grassroots Aviation, the airport’s Fixed Base Operator, along with a special ribbon cutting ceremony as part of the Saturday celebration. Invited guests include the Copiah County Board of Supervisors; local community leaders; Rans Black, Manager of the FAA district office in Jackson; Tommy Booth, aeronautics director for the Mississippi Dept. of Transportation; Congressman Bennie D. Thompson (D), representing the 2nd District of Mississippi; and U.S. Senators Thad Cochran (R) and Roger Wicker (R).

The new runway cost approximately $6 million for land acquisition, design and construction. The FAA paid 90 percent of the project cost with Copiah County and MDOT paying the remaining 10 percent. It is the first new airport runway construction since the 2003 opening of the new Tunica airport.

FMI: www.copiahcounty.org

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC