AD: Diamond Aircraft Industries GmbH Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Sep 07, 2017

AD: Diamond Aircraft Industries GmbH Airplanes

AD NUMBER: 2017-18-10

PRODUCT: Certain Diamond Aircraft Industries GmbH Models DA 42, DA 42 M-NG, and DA 42 NG airplanes.

ACTION: Final Rule.

SUMMARY:  This AD results from mandatory continuing airworthiness information (MCAI) issued by an aviation authority of another country to identify and correct an unsafe condition on an aviation product.

The MCAI describes the unsafe condition as crack formation on the flap bell crank, which could cause the flap bell crank to fail.

DATES: This AD is effective October 11, 2017

COST: The FAA estimates  this AD will affect 190 products of U.S. registry. They also estimate that it will take about 4 work-hours per product to comply with the initial inspection requirement of this AD. The average labor rate is $85 per work-hour. Based on these figures, the estimated cost of the initial inspection requirement of this AD on U.S. operators to be $64,000, or $340 per product.

The FAA estimates it will take about 2 work-hours per product to comply with the repetitive inspection requirement of this AD. The average labor rate is $85 per work-hour. Based on these figures, the estimated cost of the repetitive inspection requirement of this AD on U.S. operators to be $32,300, or $170 per product.

In addition, the FAA estimates that any necessary replacement action will take about 1 work-hour and require parts costing $430, for a cost of $515 per product. They have no way of determining the number of products that may need these actions.

According to the manufacturer, some of the costs of this AD may be covered under warranty, thereby reducing the cost impact on affected individuals. As the FAA does not control warranty coverage for affected individuals, the agency has included all costs in its cost estimate.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC