AD: Pilatus Aircraft Ltd. Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Thu, Jun 06, 2019

AD: Pilatus Aircraft Ltd. Airplanes

AD NUMBER: 2019-10-07

PRODUCT: Pilatus Aircraft Ltd. Models PC-6, PC-6/350, PC-6/350-H1, PC-6/350-H2, PC-6/A, PC-6/A-H1, PC-6/A-H2, PC-6/B-H2, PC-6/B1-H2, PC-6/B2-H2, PC-6/B2-H4, PC-6/C-H2, PC-6/C1-H2, PC-6-H1, and PC-6-H2 airplanes.

ACTION: Final Rule.

SUMMARY: This AD results from mandatory continuing airworthiness information (MCAI) issued by an aviation authority of another country to identify and correct an unsafe condition on an aviation product.

The MCAI describes the unsafe condition as sheared or missing rivets on the horizontal stabilizer hinge bracket assemblies.

DATES: This AD is effective July 10, 2019.

COST: The FAA estimates that this AD will affect 30 products of U.S. registry. Operators may incur the following costs in order to comply with this AD:

The FAA estimates that it will take about 9 work-hours per product to comply with the inspection and placard requirements of this AD. The average labor rate is $85 per work-hour. Required parts will cost about $200 per product.

Based on these figures, the FAA estimates the cost of the inspection and placard requirements on U.S. operators to be $28,950, or $965 per product.
In addition, the FAA estimates the following to do any necessary follow-on actions: Each rivet replacement will take 2 work-hours, fastener replacement will take 3 work-hours, one hinge bracket assembly replacement will take 9 work-hours, and two hinge bracket assembly replacements will take 15 work-hours.

The total estimated cost of parts will be $10,000. The FAA has no way of determining the number of products that may need replacement.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC