Center Fuselage For Italy's First F-35 Lightning II Delivered | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Jul 25, 2013

Center Fuselage For Italy's First F-35 Lightning II Delivered

Airplane To Be Assembled In Italy, Increasing International Participation

The center fuselage for Italy's first F-35 Lightning II has been delivered to the newly commissioned Final Assembly and Check Out (FACO) facility at Italy's Cameri Air Base July 12. This on-time delivery to Lockheed Martin enables the first assembly of an F-35 aircraft at the FACO facility and increases international participation on the F-35 program.

The center fuselage, AL-1, will be integrated into a conventional takeoff and landing variant of the F-35, and represents the first of 90 center fuselage sections that will be delivered to the Italian FACO facility for Italian aircraft.

"We started working on AL-1 in September 2012, when it was inducted into our Integrated Assembly Line [IAL] at our Palmdale facility," said Michelle Scarpella, vice president of the F-35 program for prime contractor Northrop Grumman. "It's the 115th center fuselage we've completed here in Palmdale, and marks another program milestone, as we continue to stand up and grow international F-35 participation."

The IAL maximizes robotics and automation, providing additional assembly capability while meeting engineering tolerances that are not easily achieved using manual methods. The IAL is central in producing the F-35's center fuselage as well as increasing the program's affordability, quality and efficiency. Currently, there are 35 center fuselages in flow on the IAL, including some for Australia and additional ones for Italy; deliveries have already been made to Ft Worth for final assembly and delivery to the Netherlands and the United Kingdom.

Set on 101 acres in Italy's Piedmont region, the FACO facility at Cameri will be one of a kind in Europe. With 22 buildings, more than a million square feet of covered work space, 11 final assembly workstations – including four outfitted for electronic mate and assembly – and five maintenance, repair, overhaul and upgrade bays, the FACO at Cameri is positioned to serve as a new hub for the Italian aerospace industry.

(Image provided by Northrop Grumman)

FMI: www.northropgrumman.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC