FAA Proposes New AD For Certain MD Helicopters Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Nov 28, 2018

FAA Proposes New AD For Certain MD Helicopters Aircraft

Prompted By Reports Of Cracked Main Rotor Blades

The FAA is proposing a new AD for MDHI Model 369A, 369D, 369E, 369FF, 369H, 369HE, 369HM, 369HS, 500N, and 600N helicopters. This proposed AD would require inspecting each main rotor blade (MRB) for a crack. This proposed AD is prompted by reports of cracked MRBs.

This proposed AD would require repetitively inspecting the MRB trim tab for gouges, nicks, scratches, and cracks.

This proposed AD is prompted by reports of two operators finding cracks on an HTC-manufactured MRB. In both cases, the cracking was located on the MRB skin adjacent to the trim tab, and they were discovered following flights in which an increase in vibration levels was noticed. HTC determined the root cause of the cracking to be fatigue. HTC also stated that there was evidence of impact damage, filing, and sanding under the paint of the cracked MRBs. If not detected and corrected, this condition could result in failure of an MRB and subsequent loss of control of the helicopter.

This proposed AD would require, within 25 hours time-in-service and thereafter at each 100-hour or annual inspection, inspecting each MRB trim tab end at the trailing edge corner where the trim tab and MRB meet for cracks, and inspecting the top and bottom surface of each MRB for a crack in the area adjacent to inboard trim tab the trim tab corner for a crack, from the trailing edge towards the leading edge. If there is a crack, this proposed AD would require replacing the MRB.

The FAA estimates that the AD would affect 622 helicopters of U.S. Registry.

At an average labor rate of $85 per work-hour, operators may incur the following costs in order to comply with this AD:

  • Inspecting one MRB would require about 0.1 work-hour, for a cost-per-helicopter of $43 for MDHI Model 369-series and 500N helicopters, and $51 for MDHI Model 600N helicopters.
  • If required, replacing one MRB would require 3 work-hours, and required parts would cost $13,000, for a cost per MRB of $13,255.

Comments on the proposed AD must be received by January 25, 2019.

(Image from file)

FMI: Proposed AD

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC