NASA Extends Space Shuttle External Tank Contract | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Dec 27, 2007

NASA Extends Space Shuttle External Tank Contract

NASA has signed a $465.7 million contract modification with Lockheed Martin, New Orleans, for space shuttle external tanks. The modification aligns and extends all activities associated with the production contract for the tanks to the launch schedule for the space shuttle's retirement date of 2010.

The modification supports the agency's priorities of safely flying the space shuttle, completing construction of the International Space Station and NASA's long-term plan to return astronauts to the moon and beyond.

The cost plus award fee/incentive fee contract will conclude Sept. 30, 2010, and brings the total value of the contract, awarded October 2000, to $2.94 billion. The contract calls for the delivery of 17 external tanks to NASA.

Work under the contract will be performed at NASA's Michoud Assembly Facility in New Orleans, NASA's Marshall Space Flight Center in Huntsville, Ala. and NASA's Kennedy Space Center, Fla.

Lockheed Martin builds, assembles and tests the space shuttle external tanks for NASA at the Michoud facility. The external tank holds the liquid hydrogen fuel and liquid oxygen for the shuttle's three main engines. It is the largest single component of the space shuttle and the only part of the shuttle that is not reused. At 154 feet tall, the gigantic rust-colored tank is taller than a 15-story building and as wide as a silo, with a diameter of about 27.5 feet. During launch, the tank acts as the structural backbone for the shuttle orbiter and the solid rocket boosters attached to it.

FMI: www.nasa.gov/shuttle

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC