Ariane 5 Is Set For A September 29 Liftoff | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Sep 27, 2017

Ariane 5 Is Set For A September 29 Liftoff

Will Carry Intelsat 37e And BSAT-4a Into Orbit

Arianespace’s ninth launch of 2017 is now scheduled for September 29 on a dual-payload Ariane 5 mission to geostationary transfer orbit with Intelsat 37e (for the global operator Intelsat) and BSAT-4a (for Space Systems Loral in the framework of a turnkey contract for the Japanese operator B-SAT).

Ariane 5 in the Final Assembly BuildingDesignated Flight VA239 in Arianespace’s mission numbering system for its launcher family, the liftoff originally had been set for September 5, but was delayed after the countdown was stopped. An anomaly was detected with an electrical component in one of the Ariane 5 launcher’s two solid boosters, which subsequently was replaced – allowing the launch vehicle’s return to flight status.

Intelsat 37e will be the fourth EpicNG spacecraft orbited by Arianespace to date. Built by Boeing based on the 702MP platform, Intelsat 37e is the first satellite to offer interconnectivity between three different bands. It will deliver high-performance service in C-, Ku- and Ka-bands for use in wireless backhaul, enterprise VSAT and mobility networks.

Flight VA239’s BSAT-4a satellite passenger will be utilized by B-SAT for Direct-to-Home (DTH) television service in Japan. Based on Space Systems Loral’s SSL 1300 platform, BSAT-4a is equipped with 24 Ku-band transponders and will expand the availability of advanced television services such as high definition and 4K/8K ultra-high definition.

(Image provided with Arianespace news release)

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC