Congresswoman Blasts FAA Over SWF Tower Delay | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Jun 20, 2006

Congresswoman Blasts FAA Over SWF Tower Delay

Software Glitch Moves Opening To August

The new control tower at Stewart International Airport (SWF) in New York was supposed to go online Friday... but it didn't. Seems a software problem has prevented the transfer of equipment between the old tower and the new.

Now, the FAA says it'll be August before the new tower is up and running... sporting a brand new radar system.

That doesn't sit well with Congresswoman Sue Kelly. She's furious at the FAA's refusal to move the Terminal Automated Radar Display and Information System (TARDIS) from the old tower -- as the airport's management apparently wants to do.

"We don’t feel that we have all the equipment that we need," airport spokeswoman Tanya Vanasse told the Hudson Valley News. "It seems, from what we can understand, and see and hear, that it’s really just a matter of moving the equipment from one location to another. So we’re hoping that the FAA will see clear to doing that for us."

Kelly added even if TARDIS stayed put, the FAA could use the old tower's 1990-vintage ASR-9 radar in the new building.

But the FAA seems adamant... and Kelly says this is the same bureaucratic mess she had to fight in 1999 to get the TARDIS system installed in the old tower in the first place.

"Now, over six years and a brand new tower later, Stewart officials and controllers are faced with the same bureaucratic obstacles to the installation of vital security equipment," Kelly said.

FMI: www.faa.gov, http://suekelly.house.gov/

Advertisement

More News

Sierra Space Repositions Dream Chaser for First Mission

With Testing Soon Complete, Launch Preparations Begin in Earnest Sierra Space's Dream Chaser has been put through the wringer at NASA's Glenn Armstrong Test Facility in Ohio, but w>[...]

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC