AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Nov 26, 2019

AD: The Boeing Company Airplanes

AD NUMBER: 2019-22-06

PRODUCT: Certain Boeing Model 737-800 series airplanes.

ACTION: Final rule

SUMMARY: This AD was prompted by reports of inadequate clearance between a certain fuel quantity indicating system (FQIS) tank unit and a certain reinforcement angle added as a part of a certain split winglet modification.

This AD requires a detailed inspection to measure the clearance between the FQIS tank unit and a certain reinforcement angle installed as a part of the split winglet modification, and repair if necessary.

DATES: This AD is effective December 30, 2019.

COST: The FAA estimates that this AD affects 16 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

Detailed Inspection

  • 7 work-hours × $85 per hour = $595 per airplane.

Repair

  • 4 work-hours × $85 per hour = $340 per airplane

According to Aviation Partners Boeing, some or all of the costs of this AD may be covered under warranty, thereby reducing the cost impact on affected individuals. The FAA does not control warranty coverage for affected individuals. As a result, the FAA has included all known costs in the agency's cost estimate.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC