London Mayor Boris Johnson Presses Ahead For New Airport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Wed, Feb 13, 2013

London Mayor Boris Johnson Presses Ahead For New Airport

Names Three Favored Sites, Plus Two In Thames Estuary

Consultants working for the city of London have identified three possible sites for a new major hub airport, and have not ruled out two additional sites in the Thames Estuary. The consultants were working in conjunction with London Mayor Boris Johnson. The group has ruled out any fourth runway at Heathrow.

The airport would be a four-runway hub designed to compete with major air hubs in Europe. Speaking before the House of Commons transport committee, Johnson said that he prefers a 24-hour 4-runway hub. He asked the committee to narrow the choice down to one or two options for the project.

The online source Buying Business Travel reports that Johnson said that after the new airport opens, likely more than 20 years in the future, Heathrow "would have a great future as a business airport, but not be an 80-million-passenger per year airport."

The consulting group is expected to begin conducting feasibility studies next month, with a goal of reporting to the Davies Commission looking at airport capacity for the U.K. government by October. A new hub airport is projected to cost as much as $124 billion including infrastructure projects like rail access and roadways.

FMI: www.gov.uk/government/organisations/airports-commission

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC