AD: Airbus Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Jul 14, 2017

AD: Airbus Helicopters

AD NUMBER: 2017-14-05

PRODUCT: Airbus Helicopters Model SA330J helicopters.

ACTION: Final Rule; request for comments

SUMMARY: This AD requires replacing certain hydraulic pumps and is prompted by reports of broken screws that attach the cover of the hydraulic pump.

EASA has issued EASA Emergency AD No. 2016-264-E, dated December 22, 2016, to correct an unsafe condition for Airbus Helicopters Model SA330J helicopters. EASA advises of reports of broken screws that attach the cover of the hydraulic pump.

A subsequent investigation identified a batch of screws delivered between July 1, 2015, and November 1, 2016, that have intrinsic embrittlement and reduced mechanical properties. Hydrogen was introduced into this batch of screws during production, causing the screws to become brittle and lack sufficient strength. These screws were installed in a batch of hydraulic pumps, part number (P/N) FR65WEO2005-175A, identified by certain serial numbers, EASA advises.

This condition, if not detected and corrected, could lead to the failure of a cover bolt and loss of fluid from the hydraulic pump, resulting in loss of the hydraulic system and subsequent loss of helicopter control. As a result, EASA AD No. 2016-264-E requires replacing the hydraulic pumps.

The FAA estimates that this AD affects 24 helicopters and that labor costs average $85 per work-hour. Based on these estimates, it is expected that replacing a hydraulic pump requires 2 work-hours and parts cost $2,500 for a total cost of $2,670 per helicopter and $64,080 for the U.S. fleet.

DATES: This AD becomes effective July 26, 2017. Comments must be received by September 11, 2017.

FMI: AD

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC