Final Pieces Of Ares I-X Flight Test Rocket Head To Launch Site | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Mar 17, 2009

Final Pieces Of Ares I-X Flight Test Rocket Head To Launch Site

Now Making 2,900-Mile Cross-Country Journey From UT To KSC

The final pieces of the Ares I-X flight test rocket left the Alliant Tech Systems manufacturing facility in Promontory, UT Thursday and began a 2,917-mile journey to its launch site at NASA's Kennedy Space Center in Florida.

The first stage motor segments are the last shipment of Ares I-X major hardware elements. The hardware will arrive in Florida later this month and undergo final processing and preparations before being stacked with the other portions of the rocket.

"This shipment means great things for the Ares I-X mission," said Ares I-X Deputy Mission Manager, Steve Davis. "It's wonderful to see the next generation of American spaceflight continue to take shape. The excitement is really building now as we start stacking the pieces and preparing for launch later this year."

The Ares I-X will be the first flight test for the Ares I rocket; the agency's next-generation spacecraft and crew launch vehicle system. The flight will provide NASA an early opportunity to test and prove hardware, analysis models, facilities and ground operations associated with Ares I.

The Ares I-X rocket is a combination of existing and simulator hardware that will resemble the Ares I rocket in size, shape and weight. It will provide valuable data to guide the final design of the Ares I. The test flight also will bring NASA one step closer to its goals of returning to the moon, and traveling to destinations beyond. The Ares I-X launch is scheduled later in 2009.

The Ares I-X first stage uses a four-segment solid rocket motor, capable of generating 3.3 million pounds of thrust. The motor provides the primary propulsion for the vehicle from liftoff to stage separation 120 seconds into the flight. The motor segments were taken from the existing space shuttle solid rocket booster inventory for the flight test. The booster used for the Ares I-X flight test is being modified to meet Ares needs by adding new forward structures and a fifth segment simulator to better replicate the size and shape of the Ares I crew launch vehicle.

FMI: www.nasa.gov/mission_pages/constellation/ares/flighttests/aresIx/index.html

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC