General Dynamics Delivers First F-15 Wideband Radome To Boeing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Mon, Apr 05, 2010

General Dynamics Delivers First F-15 Wideband Radome To Boeing

Delivery Marks The Start Of A Radar Modernization Program

General Dynamics Armament and Technical Products has delivered its first F-15 wideband nose radome to Boeing in support of the F-15 Radar Modernization Program (RMP) under a system development and demonstration (SDD) contract that was awarded in October 2008.

The RMP radome will fly on the U.S. Air Force F-15E as part of the RMP upgrade. Benefits of the radome include superior electrical performance over a wide frequency range, low weight, low part count, and the ability to perform in high heat and stress environment. The radome also includes the installation and integration of an instrument landing system antenna.

"We are pleased to achieve this program milestone on schedule and within budget to support Boeing's work on the F-15 RMP," said Jim Losse, vice president and general manager of advanced materials for General Dynamics Armament and Technical Products. "Our team in Marion has built wideband radomes for years, and we are excited to add the F-15 RMP nose radome to our facility and workforce's capabilities."

The SDD contract scope includes radome design, material strength and environmental testing, environmental and structural qualification, tool design, fabrication, assembly and repair-methods development. Production and program management is being performed at General Dynamics' advanced materials facility in Marion, VA. Ten radomes will be built as part of the SDD phase, with deliveries completed in April 2011.

FMI: www.generaldynamics.com, www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC