Cirrus Announces Second Round Of Layoffs | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.14.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Thu, Oct 30, 2008

Cirrus Announces Second Round Of Layoffs

Plants Adopt Three-Day Work Week On Slowed Production

Things are tough all over right now, thanks to the floundering US economy... and best-selling aircraft manufacturer Cirrus Design is feeling the sting. The company handed out pink slips to 105 workers Tuesday, one month after the Duluth, MN-based planemaker eliminated around 100 positions.

WDIO-10 in Duluth reports 75 workers were cut from Cirrus' headquarters and main assembly plant, in a move company president Brett Wouters says will ultimately help Cirrus become a more efficient operation.

"We definitely let go a lot of good people and we eliminated a lot of positions," said Wouters. "For the business, the business over the long haul can't support that number of positions or we don't--we're not willing to support it with the cash flow that we want to achieve."

Cirrus' SR20 and SR22 aircraft families have been the top-sellers in the category for the past six years... but sales have fallen off by roughly 10 percent this year, which led to cutbacks in production. The company recently implemented a three-day work week -- down from four -- and has also slowed development of its SRS light-sport aircraft, which is largely based on a design sourced from Poland's FK Lightplanes.

The latest round of layoffs accounted for close to 10 percent of the company's workforce, according to The Associated Press.

While acknowledging current economic strife is largely to blame for the layoffs, Wouters also said the job cuts are part of an overall drive by Cirrus to streamline its operations.

"We have a very good work force obviously of more than a hundred people -- we're very attuned to making airplanes and the kind of work we need to do to support our customers in the field," Wouters said. "I really don't believe it will have any impact -- again, it's part of a longer strategy, and if I thought that, we wouldn't have made the adjustments -- it's not about the short term demand."

Development continues on the upcoming SJ50 Vision single-engine jet (above), Wouters added.

FMI: www.cirrusdesign.com

Advertisement

More News

Classic Aero-TV: Remembering Bob Hoover

From 2023 (YouTube Version): Legacy of a Titan Robert (Bob) Anderson Hoover was a fighter pilot, test pilot, flight instructor, and air show superstar. More so, Bob Hoover was an i>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

ANN's Daily Aero-Linx (05.15.24)

Aero Linx: B-52H Stratofortress The B-52H Stratofortress is a long-range, heavy bomber that can perform a variety of missions. The bomber is capable of flying at high subsonic spee>[...]

ANN's Daily Aero-Term (05.15.24):Altimeter Setting

Altimeter Setting The barometric pressure reading used to adjust a pressure altimeter for variations in existing atmospheric pressure or to the standard altimeter setting (29.92).>[...]

Aero-News: Quote of the Day (05.16.24)

"Knowing that we play an active part in bettering people's lives is extremely rewarding. My team and I are very thankful for the opportunity to be here and to help in any way we ca>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC