AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Thu, Mar 14, 2019

AD: Airbus SAS Airplanes

AD NUMBER: 2019-05-08

PRODUCT: All Airbus SAS Model A318 and A319 series airplanes and all Model A320-211, A320-212, A320-214, A320-231, A320-232, A320-233, A321-111, A321-112, A321-131, A321-211, A321-212, A321-213, A321-231, and A321-232 airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2015-12-08, which applied to the aircraft listed above.

AD 2015-12-08 required an inspection to determine the batch number or installation date of the oxygen pipe assembly that is installed at the end of the right-hand crew distribution line, and replacement of the pipe if necessary.

This AD revises the applicability to include additional airplane models and additional pipes to be replaced if necessary. This AD was prompted by further investigation that determined that affected oxygen pipes may have been installed on more airplanes than initially identified.

DATES: This AD is effective April 16, 2019.

COST: The FAA estimates that this AD affects 50 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • 2 work-hours × $85 per hour = $170 per airplane

On-Condition costs:

  • 5 work-hours × $85 per hour = $425 per airplane.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC