AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Jul 03, 2019

AD: Airbus SAS Airplanes

AD NUMBER: 2019-12-07

PRODUCT: All Airbus SAS Model A318 and Model A319 series airplanes; Model A320- 211, -212, -214, -231, -232, and -233 airplanes; and Model A321 series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2007-11-11 and AD 2017-01- 11, which applied to the aircraft listed above.

AD 2007-11-11 required an inspection to determine the serial number of both main landing gear (MLG) sliding tubes, repetitive inspections for cracking of the affected MLG sliding tubes and corrective actions if necessary, and eventual replacement of both MLG shock absorbers.

AD 2017-01-11 required identification of the part number and serial number of the MLG sliding tubes; inspection of affected chromium plates and sliding tube axles for damage; and replacement of the sliding tube if necessary. This AD retains certain requirements of AD 2007-11-11 and AD 2017-01-11.

This AD also requires repetitive inspections of affected MLG sliding tubes for cracking, replacement of cracked MLG sliding tubes, and eventual replacement of each affected MLG sliding tube.

This AD was prompted by cracks found in the MLG sliding tubes due to certain manufacturing defects that might not be identified using the current on-wing scheduled inspections.

DATES: This AD is effective August 1, 2019.

COST: The FAA estimates that this AD affects 1,186 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • Retained actions from AD 2007-11-11 (297 airplanes): Labor: 8 work-hours × $85 per hour = $680. Parts: Up to $45,310. Cost per airplane: Up to $46,670.
  • Retained actions from AD 2017-01-11: Labor: 18 work-hours × $85 per hour = $1,530 per airplane.
  • New actions: Labor: 13 work-hours × $85 per hour = $1,105. Parts: The FAA has received no definitive data for the parts costs for the replacements. Cost per airplane (less parts) $1,105 .
  • On Condition Actions: 6 work-hours × $85 per hour = $510 per airplane. The FAA has received no definitive data for the parts costs for the replacements.
FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC