Faulty Fuel Valve Bumps Next Atlas V Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Sep 04, 2007

Faulty Fuel Valve Bumps Next Atlas V Launch

Will Lift Off Eight Days Later Than Originally Planned

A needed hardware upgrade will push the scheduled launch date for an Atlas V rocket off about one week.

Florida Today reports a problem with a hydrogen fuel valve is to blame for the bump, from September 13 to September 21. That valve is reportedly to blame for difficulties with the last Atlas V launch, resulting in that rocket delivering two National Reconnaissance Office (NRO) ocean into lower-than-optimal orbits.

The problem valve, used in both the Atlas V and Delta IV launch booster fleets, is being replaced, according to 45th Space Wing spokesperson Ken Warren. The redesigned component is less susceptible to extreme temperatures, according to industry reports.

"The delay of the Atlas V from (September 13 to September 21) was the result of hardware component upgrades made to the booster to mitigate risks identified during the last Atlas V launch," he said.

Now scheduled to launch September 21 at 2010 EDT, the next Atlas V launch from Cape Canaveral, FL will carry the first of five Wideband Global Satellites for the military.

FMI: http://en.wikipedia.org/wiki/Atlas_V

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC