Bombardier Restarting CRJ200/Challenger 850 Production | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Feb 10, 2006

Bombardier Restarting CRJ200/Challenger 850 Production

Flexibility Of CRJ200 Platform Satisfies Three Distinct Markets   

Bombardier is restarting production of the Bombardier CRJ200/Challenger 850 aircraft platform. The production is scheduled to start in mid-April 2006 and will take place at Bombardier's Dorval facility to primarily meet present and anticipated demand for Challenger 850 business jets.

On October 2005, Bombardier had announced the temporary suspension of the production of the CRJ200 aircraft platform.

The impact on the level of employment from this new production will result in the recall of approximately 50 employees at the Dorval facility.

"The unparalleled flexibility and superior technology of the original CRJ200 airliner platform continues to generate significant interest in three distinct offerings - as a corporate shuttle, and as a large cabin executive jet, in addition to the market-leading 50-passenger CRJ regional airliner," said Pierre Beaudoin, President and Chief Operating Officer, Bombardier Aerospace.

"Challenger 850 aircraft operators are able to take advantage of an outstanding dispatch reliability based on the proven CRJ200 aircraft record, low direct operating costs and an established worldwide support network," he added.

FMI: www.bombardier.com

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC