Atlantis Launch Date Pushed Back | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Oct 21, 2009

Atlantis Launch Date Pushed Back

Move Gives NASA More Ares I-X Launch Opportunities

NASA is now targeting Nov. 16 for the launch of space shuttle Atlantis' STS-129 mission from the agency's Kennedy Space Center in Florida.

Managers for NASA's Space Operations Mission Directorate and Exploration Systems Mission Directorate met Monday and decided to adjust Atlantis' target launch date to optimize the agency's ability to launch both Ares I-X and Atlantis before the end of the year. The same launch team at Kennedy is supporting both the shuttle and the flight test of the Ares I-X rocket, which is targeted to lift off on October  27. Ares I-X rolled out to its launch pad at 0001 EDT Tuesday.

Atlantis' new target launch date will give Ares I-X launch opportunities October 27, 28 and 29. NASA has yet to schedule Atlantis' new target liftoff date on the Eastern Range.

The change to Atlantis' targeted launch will affect the launch countdown dress rehearsal for the shuttle's six astronauts. The astronauts arrived at Kennedy on Monday for the Terminal Countdown Demonstration Test and related training. The simulated countdown has been rescheduled to November 3. The astronauts will practice emergency escape and other related training while they are at Kennedy this week and return there November  2 to conclude their rehearsal work.

The agency's Flight Readiness Review meeting for STS-129 is set for October 29. NASA will schedule an official launch date for Atlantis following that meeting.

FMI: http://www.nasa.gov/shuttle

Advertisement

More News

Airbus Racer Helicopter Demonstrator First Flight Part of Clean Sky 2 Initiative

Airbus Racer Demonstrator Makes Inaugural Flight Airbus Helicopters' ambitious Racer demonstrator has achieved its inaugural flight as part of the Clean Sky 2 initiative, a corners>[...]

Diamond's Electric DA40 Finds Fans at Dübendorf

A little Bit Quieter, Said Testers, But in the End it's Still a DA40 Diamond Aircraft recently completed a little pilot project with Lufthansa Aviation Training, putting a pair of >[...]

ANN's Daily Aero-Term (04.23.24): Line Up And Wait (LUAW)

Line Up And Wait (LUAW) Used by ATC to inform a pilot to taxi onto the departure runway to line up and wait. It is not authorization for takeoff. It is used when takeoff clearance >[...]

NTSB Final Report: Extra Flugzeugbau GMBH EA300/L

Contributing To The Accident Was The Pilot’s Use Of Methamphetamine... Analysis: The pilot departed on a local flight to perform low-altitude maneuvers in a nearby desert val>[...]

Classic Aero-TV: 'Never Give Up' - Advice From Two of FedEx's Female Captains

From 2015 (YouTube Version): Overcoming Obstacles To Achieve Their Dreams… At EAA AirVenture 2015, FedEx arrived with one of their Airbus freight-hauling aircraft and placed>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC