SpaceX Dragon Flight To ISS Postponed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Jan 17, 2012

SpaceX Dragon Flight To ISS Postponed

No New Launch Date Set For COTS 2 And 3 Demos

SpaceX's much anticipated launch of an unmanned Dragon spacecraft to dock with ISS has been postponed, with no new launch date set for the test.

SpaceX had gotten permission from NASA to combine the COTS 2 and 3 demonstration flights into one. The launch date had originally been set for February 7th, but that launch has been pushed back to allow for what's being called "due diligence" and "safety checks" for the spacecraft.

The C2 demo will bring the spacecraft to near proximity of ISS, a fly-by of about two miles. If that is accomplished satisfactorily, then the C3 demo ... an actual docking of the Dragon to the ISS, can proceed. The spacecraft would be grappled with the station's robotic arm and brought in to berth with the station's Harmony module. The spacecraft will carry non-essential supplies for the demonstration. If any portion of the C2 demonstration has a major issue, the C/3 demonstration will be pushed to a later flight.

NASASpaceflight.com reports that there has been no specific reason for the delay. SpaceX said in a news release that “We are now working with NASA to establish a new target launch date, but note that we will continue to test and review data. We will launch when the vehicle is ready.”

FMI: www.spacex.com


Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC