AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Sep 28, 2018

AD: The Boeing Company Airplanes

AD NUMBER: 2018-19-20

PRODUCT: Certain Boeing Model 737-200, -300, -400, and -500 series airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2010-25-06, which applied to the aircraft listed above.

AD 2010-25-06 required repetitive inspections for cracking of certain fuselage frames and stub beams, and corrective actions if necessary.

AD 2010-25-06 also provided for an optional repair, which terminated the repetitive inspections. For airplanes on which a certain repair was done, AD 2010-25-06 also required repetitive inspections for cracking of certain fuselage frames and stub beams, and corrective actions if necessary.

This AD retains the actions required by AD 2010-25-06 and expands the inspection area. This AD was prompted by additional cracking found in areas not covered by the inspections in AD 2010-25-06.

DATES: This AD is effective October 31, 2018.

COST: The FAA estimates that this AD affects 67 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Inspections - Up to 67 work-hours × $85 per hour = $5,695 per inspection cycle.
  • Repairs/replacements - Up to 76 work-hours × $85 per hour = $6,460* per aircraft

* All required parts are supplied by the operator. This cost is minimal, and the FAA has no way to determine what an operator would pay for these parts. The FAA has received no definitive data that would enable us to provide cost estimates for certain other repairs specified in this AD.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

Aero-News: Quote of the Day (05.03.24)

"We are reaching out to you today on behalf of the Popular Rotorcraft Association because we need your help. We are dangerously close to losing a critical resource that if lost, wi>[...]

ANN's Daily Aero-Term (05.03.24): UAS Traffic Management (UTM)

UAS Traffic Management (UTM) The unmanned aircraft traffic management ecosystem that will allow multiple low altitude BVLOS operations and which is separate from, but complementary>[...]

ANN's Daily Aero-Linx (05.03.24)

Aero Linx: Society of Aviation and Flight Educators (SAFE) SAFE is a member-oriented organization of aviation educators fostering professionalism and excellence in aviation through>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC