AD: The Boeing Company Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Dec 19, 2018

AD: The Boeing Company Airplanes

AD NUMBER: 2018-25-11

PRODUCT: Certain The Boeing Company Model 777- 200 and - 300 series airplanes equipped with Rolls -Royce Model RB211- Trent 800 engines.

ACTION: Final Rule.

SUMMARY:This AD was prompted by reports of inadequate clearance between the thermal protection system (TPS) insulation blankets and the electronic engine control (EEC) wiring, which resulted in damaged wires.

This AD requires repetitive inspections of the EEC wire bundles and clips, and corrective actions if necessary.

DATES: This AD is effective January 18, 2019.

COST: The FAA estimates that this AD affects 55 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

  • Inspection - Up to 6 work- hours × $85 per hour = $510 per inspection cycle per airplane.

Replacement of EEC wire harness (if necessary)

  • Labor - 1 work- hour × $85 per hour = $85
  • Parts - $8,500
  • Cost per aircraft - $8,585
FMI: AD

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC