SpaceX Announces Arrival Of Final Falcon 9 Flight Hardware At Cape Canaveral | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 01.15.18

Airborne-UnManned 01.16.18

Airborne 01.17.18

AMA Drone Report 01.18.18

Airborne 01.19.18

Airborne-YouTube

Airborne 01.15.18

Airborne-UnManned 01.16.18

Airborne 01.17.18

AMA Drone Report 01.18.18

Airborne 01.19.18

Fri, Feb 12, 2010

SpaceX Announces Arrival Of Final Falcon 9 Flight Hardware At Cape Canaveral

Preparations Continue For Inaugural Launch

Space Exploration Technologies (SpaceX) says that all of the flight hardware for the debut launch of the Falcon 9 vehicle has arrived at the SpaceX launch site, Space Launch Complex 40 (SLC-40), in Cape Canaveral, Florida.

Final delivery included the Falcon 9 second stage, which recently completed testing at SpaceX's test facility in McGregor, Texas. SpaceX has now initiated full vehicle integration of the 47 meter (154 feet) tall, 3.6 meter (12 feet) diameter rocket, which will include a Dragon spacecraft qualification unit.

"We expect to launch in one to three months after completing full vehicle integration," said Brian Mosdell, Director of Florida Launch Operations for SpaceX. "Our primary objective is a successful first launch and we are taking whatever time necessary to work through the data to our satisfaction before moving forward."

Following full vehicle integration, SpaceX will conduct a static firing to demonstrate flight readiness and confirm operation of ground control systems in preparation for actual launch.

Artist's Rendering

Though designed from the beginning to transport crew, SpaceX's Falcon 9 launch vehicle and Dragon spacecraft will initially be used to transport cargo. Falcon 9 and Dragon were selected by NASA to resupply the International Space Station (ISS) once Shuttle retires. The $1.6B contract represents 12 flights for a minimum of 20 tons to and from the ISS with the first demonstration flights beginning in 2010.

FMI: www.spacex.com

Advertisement

More News

Airborne-Unmanned 01.16.18: AUVSI Trusted Operator, Typhoon H Plus, Intel

Also: Drones Tracking Illegal Dumping, Arctic UAS, Airspace Situational Awareness, TrueView R20 AUVSI has announced the appointment of leading industry stakeholders to serve on a s>[...]

Airborne 01.19.18: Airbus A380 Reprieve, FAA Sued, FAA Defends Drop Zone

Also: Skydiving Museum, Nature Air Suspended, IAC 2017 Collegiate Program, StandardAero Ceases LAX Ops You can hear the sigh of relief from across the Atlantic... After several mon>[...]

AMA Drone Report 01.18.18: 1 Million Drone Reg's, Autel EVO, FAA Sued Again

Also: New DJI Mavic?, SureFly Not Yet, Drones Tracking Illegal Dumping, 'Illicit' Drone Video The FAA has registered a million drones, the DOT announced last week at CES in Las Veg>[...]

Aero-News: Quote of the Day (01.21.18)

“Being in structural maintenance kind of centers around building parts for the aircraft. I took a personal interest in the project because it’s not something we normall>[...]

ANN's Daily Aero-Term (01.21.18): Obstacle Departure Procedure (ODP)

Obstacle Departure Procedure (ODP) A preplanned instrument flight rule (IFR) departure procedure printed for pilot use in textual or graphic form to provide obstruction clearance v>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2018 Web Development & Design by Pauli Systems, LC