SpaceX Announces Arrival Of Final Falcon 9 Flight Hardware At Cape Canaveral | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date






Airborne On ANN

Airborne 11.23.15

Airborne 11.24.15

Airborne 11.18.15

Airborne 11.19.15

Airborne 11.20.15

Airborne Hi-Def On YouTube

Airborne 11.23.15

Airborne 11.24.15

Airborne 11.18.15

Airborne 11.19.15

Airborne 11.20.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Fri, Feb 12, 2010

SpaceX Announces Arrival Of Final Falcon 9 Flight Hardware At Cape Canaveral

Preparations Continue For Inaugural Launch

Space Exploration Technologies (SpaceX) says that all of the flight hardware for the debut launch of the Falcon 9 vehicle has arrived at the SpaceX launch site, Space Launch Complex 40 (SLC-40), in Cape Canaveral, Florida.

Final delivery included the Falcon 9 second stage, which recently completed testing at SpaceX's test facility in McGregor, Texas. SpaceX has now initiated full vehicle integration of the 47 meter (154 feet) tall, 3.6 meter (12 feet) diameter rocket, which will include a Dragon spacecraft qualification unit.

"We expect to launch in one to three months after completing full vehicle integration," said Brian Mosdell, Director of Florida Launch Operations for SpaceX. "Our primary objective is a successful first launch and we are taking whatever time necessary to work through the data to our satisfaction before moving forward."

Following full vehicle integration, SpaceX will conduct a static firing to demonstrate flight readiness and confirm operation of ground control systems in preparation for actual launch.

Artist's Rendering

Though designed from the beginning to transport crew, SpaceX's Falcon 9 launch vehicle and Dragon spacecraft will initially be used to transport cargo. Falcon 9 and Dragon were selected by NASA to resupply the International Space Station (ISS) once Shuttle retires. The $1.6B contract represents 12 flights for a minimum of 20 tons to and from the ISS with the first demonstration flights beginning in 2010.



More News

Blue Origin Makes History, But Is The System Practical

Only Time Will Tell If The Booster Is Truly Reusable On November 23, 2015 Blue Origin achieved a first in rocketry and spaceflight history when their New Shepard launch vehicle suc>[...]

Dassault Falcon Jet Completes New Little Rock Expansion

Facility Earmarked For Work On Falcon 8X And Falcon 5X Airplanes Dassault Falcon Jet has completed another major expansion of its Little Rock Completion Center that will add 350,00>[...]

ICAO World Aviation Forum Charts Course To Sustainable Aviation Benefits

First-Ever Forum Of Its Type Draws Over 800 International Officials Over 800 Ministers and senior officials from States, UN and international organizations have gathered at the Hea>[...]

Russian Warplane Shot Down By Turkey On Syrian Border

Kremlin Say There Was No Violation Of Turkish Airspace Tensions between Russia and Turkey, and by extension NATO, escalated Tuesday when a Russian Su-24 was shot down by Turkey aft>[...]

AD: Airbus Airplanes

AD NUMBER: 2015-23-06 PRODUCT: Certain Airbus Model A330-200, A330-300, and A340-300 series airplanes.>[...]

blog comments powered by Disqus





© 2007 - 2015 Web Development & Design by Pauli Systems, LC