SpaceX Announces Arrival Of Final Falcon 9 Flight Hardware At Cape Canaveral | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne On ANN

ADR 02.20.17

Airborne 02.20.17

Airborne 02.21.17

Airborne 02.22.17

Airborne 02.23.17

Airborne 02.24.17

Airborne-HD On YouTube

ADR 02.20.17

Airborne 02.20.17

Airborne 02.21.17

Airborne 02.22.17

Airborne 02.23.17

Airborne 02.24.17

Fri, Feb 12, 2010

SpaceX Announces Arrival Of Final Falcon 9 Flight Hardware At Cape Canaveral

Preparations Continue For Inaugural Launch

Space Exploration Technologies (SpaceX) says that all of the flight hardware for the debut launch of the Falcon 9 vehicle has arrived at the SpaceX launch site, Space Launch Complex 40 (SLC-40), in Cape Canaveral, Florida.

Final delivery included the Falcon 9 second stage, which recently completed testing at SpaceX's test facility in McGregor, Texas. SpaceX has now initiated full vehicle integration of the 47 meter (154 feet) tall, 3.6 meter (12 feet) diameter rocket, which will include a Dragon spacecraft qualification unit.

"We expect to launch in one to three months after completing full vehicle integration," said Brian Mosdell, Director of Florida Launch Operations for SpaceX. "Our primary objective is a successful first launch and we are taking whatever time necessary to work through the data to our satisfaction before moving forward."

Following full vehicle integration, SpaceX will conduct a static firing to demonstrate flight readiness and confirm operation of ground control systems in preparation for actual launch.

Artist's Rendering

Though designed from the beginning to transport crew, SpaceX's Falcon 9 launch vehicle and Dragon spacecraft will initially be used to transport cargo. Falcon 9 and Dragon were selected by NASA to resupply the International Space Station (ISS) once Shuttle retires. The $1.6B contract represents 12 flights for a minimum of 20 tons to and from the ISS with the first demonstration flights beginning in 2010.

FMI: www.spacex.com

Advertisement

More News

Airborne 02.24.17: RV-10 Suit Dismissed, 2016 GA Sales, Red Tail Legacy

Also: Falcon 9 Landing, TFR Busts, Denton Airshow, QF-16, Treasure Coast, 'Fly Safe' Campaign, Juno Mission When the news first came out, in 2015, that Van's Aircraft was sued for >[...]

Aero-TV: 'I Feel I Can Fly' - PLW Modelworks's Birdly IITSEC 2016 FlightSim Demo

A Truly Unique Flying Experience… Most of us have dreamed of being able to fly like a bird. And while that’s not an option for most of us, unless you’re interest>[...]

Airborne 02.23.17: Sonaca 200, Yuneec H920 Plus, SpaceX Delays Mars Mission

Also: NextGen Blimps, AEA/HAI Coverage, L-39 Suit, Drone User Group, Red Arrows Pilot Inquest, 2nd T-50A, Steve Fossett Honored Sonaca Aircraft is getting ready to start certificat>[...]

Airborne 02.24.17: RV-10 Suit Dismissed, 2016 GA Sales, Red Tail Legacy

Also: Falcon 9 Landing, TFR Busts, Denton Airshow, QF-16, Treasure Coast, 'Fly Safe' Campaign, Juno Mission When the news first came out, in 2015, that Van's Aircraft was sued for >[...]

AD: The Boeing Company Airplanes

AD NUMBER: 2017-04-07 PRODUCT: Certain The Boeing Company Model 757 airplanes.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC