Space Shuttle Discovery Continues Launch Preparations | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Aug 18, 2009

Space Shuttle Discovery Continues Launch Preparations

Next Scheduled Launch Just A Week Away

While space shuttle Discovery's STS-128 launch preparations continue at Florida's Kennedy Space Center, the astronaut crew completed its final planned integrated ascent training in Houston at NASA's Johnson Space Center. Launch is planned for 0158 EDT on Monday, August 24th.

Late last week, shuttle managers approved 18 additional plug pull tests on the orbiter side of the external fuel tank to ensure there are no issues with its intertank region. Engineers at the tank's manufacturing plant in New Orleans are assessing high-tech X-ray data to ensure protective foam ramps on the tank slated for November's STS-129 mission show no defects.

The ice-frost ramps (IFR) protect brackets along the external tank from development of ice when super-cold liquid oxygen and hydrogen are loaded prior to launch. Foam loss during the last two shuttle launches from one particular IFR high up on the liquid oxygen tank has led to a detailed examination to determine if it is acceptable to launch Discovery without further work.

Meanwhile, the STS-128 crew conducted its final launch training session integrated with Mission Control before heading into quarantine Monday. They will fly to Kennedy on Wednesday to prepare for launch.

FMI: www.nasa.gov
 

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC