Ariane 5 On Track For Next Month's Mission | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Sun, Sep 25, 2016

Ariane 5 On Track For Next Month's Mission

Pace Of Pre-Flight Activities Increasing At Spaceport In French Guiana

Pre-flight activities for Arianespace’s upcoming Ariane 5 mission are ramping up at the Spaceport in French Guiana, with launcher and payload preparations advancing in parallel for the October 4 liftoff.

In a major milestone reached this month, Ariane 5 was rolled out from the Spaceport’s Launcher Integration Building – where its core cryogenic stage, two solid boosters and cryogenic upper stage were mated – to the Final Assembly Building. This process formally transferred authority for the heavy-lift vehicle to Arianespace from production prime contractor Airbus Safran Launchers.

With Ariane 5 now under Arianespace’s responsibility, the launcher is in position to receive its two passengers: the Sky Muster II and GSAT-18 telecommunications satellites, both of which were fueled earlier this month inside the Spaceport’s S5 payload preparation facility.

The October 4 mission with Ariane 5 is designated Flight VA231 in Arianespace’s numbering system, and it will deliver the two spacecraft to geostationary transfer orbit.

There will be two payloads on board for the launch. Built by SSL (Space Systems Loral) for the Australian national broadband network (nbn), Sky Muster II will utilize advanced-design multiple spot beams to help bridge the digital divide for some 400,000 homes and businesses in regional and remote areas of the country.

Sky Muster II is one of the world’s largest communications platforms with a liftoff mass estimated at 6,400 kg. Its launch follows the orbiting of nbn’s first Sky Muster satellite on an Arianespace Ariane 5 mission performed in September 2015.

Flight VA231’s second passenger – GSAT-18 – is a telecommunications spacecraft developed by the Indian Space Research Organisation (ISRO). Once in orbit, it will serve as a replacement for operational satellites that currently provide key national services in multiple frequency bands – to be joined by GSAT-17, which will be orbited on a future Ariane 5 mission from the Spaceport in French Guiana.

(Image provided with Arianespace news release)

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC