Columbia 400 On Track For Late 1st Quarter Certification | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Fri, Oct 31, 2003

Columbia 400 On Track For Late 1st Quarter Certification

The Lancair Company has revealed that the turbocharged Columbia 400 is on schedule for certification in March of 2004 and the company expects to begin delivering aircraft later that same month.

Lancair began flying its flight test prototype aircraft again on October 20th and now says that they are back to the point they were at when their first flight test aircraft was lost back in August.

“We are now about to transition from company flight testing to testing for certification credit,” said Lancair Vice President Tom Bowen who is heading up the certification program.

“We are at the point where we are done making aerodynamic modifications to the aircraft and are now just proving what we’ve done so we can achieve certification.”

The Lancair Company is also proceeding with a new conforming flight test aircraft to replace the one lost in the August accident. That aircraft is expected to begin flying in late November.

In addition to flight testing progress, Lancair has submitted the Columbia 400’s drawing package to the FAA for evaluation and sign off. The company has also nearly completed the production tooling for the
aircraft in preparation for serial manufacturing once the model receives final certification.

“The accident was a delay, no doubt about it. Fortunately, however, it wasn’t the result of a problem with the aircraft and we were able to get the program back up to speed pretty rapidly,” Bowen continued.

Apparently, the certification program isn’t the only thing moving swiftly. It seems that flight test data are indicating that the Columbia 400 will be the fastest certified piston-powered aircraft on the market once the certification program is complete.


“We’re not at a point where we want to release official numbers yet, but we feel confident that the Columbia 400 will be faster than any current certified piston-powered aircraft on the market – fixed gear or retractable, single engine or twin,” Bowen said. “The aircraft has an amazingly broad flight envelope.”

Founded in 1995, The Lancair Company manufactures the Columbia line of all-composite, high performance certified aircraft. Based in Bend, Oregon, the company is currently delivering the all-electric, normally aspirated Columbia 350.

FMI: www.lancair.com

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC