EASA Refines Single Sky Traffic Management Plan | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Oct 17, 2012

EASA Refines Single Sky Traffic Management Plan

Calls Updated Document A 'Pragmatic Approach To Modernizing Europe’s Air Traffic Management Systems'

Europe’s Single Sky modernization has been refined with an update of the European Air Traffic Management Master Plan. This is the newly-agreed-to strategic plan providing technological and operational roadmaps to all aviation stakeholders. It allows for timely, coordinated and efficient deployment of new technologies and procedures in the timeframe to 2030. Its content has been aligned with International Civil Aviation Organisation’s Aviation System Block Upgrades (ASBU), in order to secure global interoperability and synchronization.

At its core, the Master Plan is performance-driven, responding to the four Key Performance Areas (KPAs) of environment, cost-efficiency, safety and capacity.  These criteria, set by the European Commission, form part of the wider set of ICAO KPAs. First drafted in early 2009, the Master Plan is intended to evolve with time. This 2012 version helps to better achieve the high level goals of Single European Sky (SES), as set by the European Commission.

The results achieved so far in the R&D program have helped determine intermediate performance targets feeding into SES High level goals. These revised targets correspond to the contribution of SESAR, one (for technology) of the five SES pillars (the other four are Performance, Safety, Airports and Human factor).

Each stakeholder, including the airspace users, air navigation service providers, airport operators, and the network managers (civil and military included), is provided with a roadmap detailing the type and date of the ATM technology change required in the first step of SESAR. These time-based roadmaps also feature necessary air/ground deployment synchronization dates.
 
Furthermore, roadmaps are included for infrastructure (communication, navigation and surveillance), standardization and regulation. These allow a common European understanding of required changes, in preparation of ICAO’s Twelfth Air Navigation Conference (ANC 12).

The Master Plan focuses on a series of operational changes deemed “essential” to best deliver performance benefits to one or more operating environments, i.e. airport, en-route, terminal maneuvering area, and the network. This allows stakeholders to focus their efforts on a manageable set of necessary changes to reach the Single European Sky high-level goals. These essential operational changes are grouped into six key features which will evolve through three steps up to 2030:

  • Moving from Airspace to 4D Trajectory Management
  • Traffic Synchronization
  • Network Collaborative Management and Dynamic/ Capacity Balancing
  • System Wide Information Management
  • Airport Integration and Throughput
  • Conflict Management and Automation

ICAO’s Global Air Navigation Plan will be based on Aviation System Block Upgrades (ASBU), a suite of modules organized into flexible and scalable building blocks where each module represents a specific, well defined improvement. For the development of the ASBUs, ICAO made use of the material provided by SESAR and the U.S. FAA’s NextGen program. From a SESAR perspective, mapping ICAO’s ASBU was key to achieving global interoperability and synchronization, where and when necessary.

FMI: www.sesarju.eu

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC