DOT IG To Conduct Another Audit Of ADS-B | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Oct 10, 2014

DOT IG To Conduct Another Audit Of ADS-B

Will Focus On FAA's Ability To Monitor Contractors And Payment Procedures

The DOT Inspector General (IG) will conduct another audit of the FAA's progress on the implementation of ADS-B beginning later this month.

A memo dated October 7 from Matthew E. Hampton, Assistant Inspector General for Aviation Audits to "Director of Audit and Evaluation" states that this new audit follows a 2010 report which indicated that the FAA "faces significant risks in implementing the ADS-B program and realizing benefits due to weaknesses in its contract management and oversight."

The initial audit found that the ADS-B contract structure bundles and comingles tasks and costs, making it difficult for decision-makers to manage the contract and track costs. In addition, the IG recently reported changes to the program cost, including the addition of $162 million for performance incentives for the prime contractor through 2025.

The IG is initiating this audit to determine whether the ADS-B contract provides FAA the ability to monitor whether the contractor is providing required ADS-B products and services and evaluate FAA’s procedures for determining payments to the contractor.

The audit will be performed at FAA Headquarters, the ADS-B prime contractor facility, and "other relevant sites."

(FAA Graphic)

FMI: www.oig.dot.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.02.24)

Aero Linx: Model Aeronautical Association of Australia MAAA clubs are about fun flying, camaraderie and community. For over 75 years, the MAAA has been Australia’s largest fl>[...]

ANN's Daily Aero-Term (05.02.24): Touchdown Zone Lighting

Touchdown Zone Lighting Two rows of transverse light bars located symmetrically about the runway centerline normally at 100 foot intervals. The basic system extends 3,000 feet alon>[...]

Aero-News: Quote of the Day (05.02.24)

“Discovery and innovation are central to our mission at Virgin Galactic. We’re excited to build on our successful record of facilitating scientific experiments in subor>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Cirrus Design Corp SR20

Student Pilot Reported That During Rotation, “All Of A Sudden The Back Of The Plane Kicked To The Right..." Analysis: The student pilot reported that during rotation, “>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC