AD: Leonardo S.p.A. Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Tue, Jun 04, 2019

AD: Leonardo S.p.A. Helicopters

AD NUMBER: 2019-09-04

PRODUCT: Certain Leonardo S.p.A. (Type Certificate previously held by Finmeccanica S.p.A., AgustaWestland S.p.A.) Model AW109SP helicopters.

ACTION: Final Rule.

SUMMARY: This AD requires inspecting and altering the rescue hoist.

This AD was prompted by a report of a damaged hoist cable that detached after load application.

DATES: This AD is effective July 3, 2019.

COST: The FAA estimates that this AD affects 30 helicopters of U.S. Registry. Operators may incur the following costs in order to comply with this AD:

Labor rates are estimated at $85 per hour.

  • Inspecting the hoist handle assembly, cabin doorframe, and hoist cable requires about 2 hours, for a cost of $170 per helicopter. Replacing the hardware on the hoist handle assembly requires about 1 hour and required parts costs are minimal, for a cost of $85 per helicopter.
  • If required, replacing a hoist cable requires about 3 hours and required parts cost $3,150, for a cost per helicopter of $3,405.

According to Leonardo Helicopters' service information, some of the costs of this AD may be covered under warranty, thereby reducing the cost impact on affected individuals. The FAA does not control warranty coverage by Leonardo Helicopters. Accordingly, all costs have been included in the cost estimate.

FMI: AD

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC