Payload Integration Underway For Arianespace's Year-Opening Ariane 5 Mission | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Thu, Jan 02, 2020

Payload Integration Underway For Arianespace's Year-Opening Ariane 5 Mission

Two Satellites Will Be Carried Into Orbit By The Launcher

Payload integration is underway for Arianespace’s first mission of 2020 – designated Flight VA251 – which will orbit satellites at the service of two long-time partners using an Ariane 5 launch vehicle.

Recent activity at the Spaceport in French Guiana included initial steps in creating the dual-payload configuration, with Eutelsat’s KONNECT satellite riding in the upper position. This involved installing the spacecraft atop Ariane 5’s SYLDA dispenser system during activity inside the launcher’s Final Assembly Building.

KONNECT will now be encapsulated by Ariane 5’s protective fairing, completing the payload configuration’s upper portion and readying it for positioning over co-passenger GSAT-30 once this spacecraft from the Indian Space Research Organization (ISRO) is installed atop the heavy-lift launcher.

Following Ariane 5’s liftoff from the Spaceport on January 16, KONNECT will be released into geostationary transfer orbit (GTO) first, followed by the separation of SYLDA – enabling GSAT-30’s subsequent deployment to GTO.

KONNECT – which was produced by Thales Alenia Space – is a new-generation high-throughput satellite that will deliver services across Europe and Africa. Featuring all-electric propulsion and configured for operation in Ka-band, it is the first to use Thales Alenia Space’s Spacebus NEO platform developed under the Neosat Partnership Project conducted by the European and French space agencies (ESA and CNES).

ISRO’s GSAT-30 was built using an I-3K satellite platform, and is to provide high-quality television, telecommunications and broadcasting services. It will have a liftoff mass of some 3,450 kg. and is to ensure continuity of service for India’s INSAT 4A, positioned at 83 deg. East longitude.

(Image provided withe Arianespace news release)

FMI: www.arianespace.com

Advertisement

More News

Airborne 05.19.25: Kolb v Tornados, Philippine Mars, Blackhawk Antler Theft

Also: Tentative AirVenture Airshow Lineup, Supersonic Flight Regs, Private Pilot Oral Exam Guide, Boeing Deal The sport aircraft business can be a tough one... especially when Moth>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Term (05.23.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

Aero-News: Quote of the Day (05.23.25)

“While we are relieved that no one was injured, the destruction of our aircraft will have severe consequences on our operations, and it is a personal blow to our dedicated te>[...]

ANN's Daily Aero-Linx (05.23.25)

Aero Linx: Ercoupe Owners Club We fly an airplane that was the peak of pre-World War II development. It took more than a decade and a half before the features of the Ercoupe were t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC