FAA Denies Permission For Wind Farm Construction | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, May 09, 2013

FAA Denies Permission For Wind Farm Construction

Proposed Wind Turbines In Litchfield, NY, Would Disrupt Air Traffic, Agency Says

The FAA has told Ridgeline Energy that its proposal for a wind farm in the upstate New York town of Litchfield east of Syracuse would pose a hazard to air traffic.

The FAA has issued 11 letters to the energy company, according to a report from the Utica, NY, Observer-Dispatch. The company had proposed to build wind turbines as tall as 492 feet, which the FAA said significantly exceeded its height standards. The agency told the power company that the wind turbines could be no higher that 85 to 175 feet, depending on their proximity to the Utica VORTAC.

In the letter, the FAA says the structures could have an "adverse physical or electromagnetic interference effect upon navigable airspace or air navigation.”

The turbines were to be erected in Clayville, a village within the Litchfield city limits, the letters said.

Your News Now reports that the town of Litchfield has passed a law that bans such turbines from being built there. Ridgeline Energy, the company hoping to establish the wind farm, had asked the state to override the local law and allow the structures to be built.

(Wind farm image from file)

FMI: www.faa.gov

Advertisement

More News

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

NTSB Prelim: Rutan Long-EZ

The Pilot Attempted Several Times To Restart The Engine And Diverted To Long Beach Airport/Daughtery Field On October 20, 2025, about 1603 Pacific daylight time, an experimental am>[...]

ANN's Daily Aero-Term (12.05.25): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (12.05.25)

"The latest development underscores the government of Malaysia’s commitment in providing closure to the families affected by this tragedy..." Source: From statements made by >[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC