First Production VH-71 To Start Final Production Phase | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Jan 12, 2009

First Production VH-71 To Start Final Production Phase

Integration Of Helo's Systems Begins At Owego Facility

The first Lockheed Martin pilot production VH-71 presidential helicopter to begin the integration and final production process arrived at the company's Owego, NY, facility Friday. Six of nine helicopters that make up the first phase of the VH-71 presidential helicopter program are now in the US, including four test-configured aircraft and two production aircraft.

"The arrival of this production aircraft to the Lockheed Martin facility here is a great start to the new year, after a very successful year for the program in 2008," said Jeff Bantle, Lockheed Martin VH-71 vice president and general manager. "Four years into the program, six aircraft are in the US undergoing flight testing or integration, systems integration laboratories are fully functional and the helicopter is meeting or exceeding all key performance parameters."

The helicopter, pilot production aircraft number three (PP-3), will now be integrated with mission systems, outfitted with a cabin interior, painted in presidential livery and flight tested before being delivered to the US Navy and ultimately to Marine Helicopter Squadron One.

Two VH-71 test aircraft are also at the facility, undergoing mission systems installation. At Naval Air Station Patuxent River, MD two additional test helicopters are conducting flight testing, while production aircraft PP-1, which joined the test program November 24, is conducting ground vibration testing, after which it will also be flown to Lockheed Martin's Owego facility for integration and completion.

The VH-71 program is divided into two phases, or increments. Increment One provides five helicopters on an accelerated schedule with improved capabilities over the current fleet. Increment Two will provide a fleet of 23 helicopters that complete the White House requirements for a command and control platform.

FMI: www.lockheedmartin.com/

Advertisement

More News

NTSB Final Report: Piper PA-44-180

While On The Base Leg Of The Airport Traffic Pattern The Right Main Landing Gear Did Not Fully Extend Analysis: Both pilots reported that after performing airwork they returned to >[...]

Classic Aero-TV: The Bizarre Universe of Klyde Morris Cartoons

From 2023 (YouTube Edition): Putting the ANT in Antihero A Beech Starship speeds along at altitude. “Deflectors on!” a voice from within the aircraft cries. “Look>[...]

ANN's Daily Aero-Term (11.09.25): Minimum Friction Level

Minimum Friction Level The friction level specified in AC 150/5320-12, Measurement, Construction, and Maintenance of Skid Resistant Airport Pavement Surfaces, that represents the m>[...]

Aero-News: Quote of the Day (11.09.25)

“Beginning this aircraft subsystem testing is the culmination of more than a decade of focused engineering and certification refinements. This is the moment where our intende>[...]

Classic Aero-TV: Falling for Para-Phernalia’s Softie Emergency Parachutes

From 2023 (YouTube Edition): The Best Option for A Pilots’ Worst Days Since its 1979 founding, Para-Phernalia, Inc. has designed and manufactured the Softie line of pilot eme>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC