AD: Pilatus Aircraft Ltd. Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.12.25

Airborne-NextGen-05.13.25

AirborneUnlimited-05.14.25

Airborne-FlightTraining-05.15.25

AirborneUnlimited-05.16.25

Wed, Dec 22, 2021

AD: Pilatus Aircraft Ltd. Airplanes

AD 2021-24-22 Requires Inspecting And Modifying The Rudder, Elevator, And Right-Hand (RH) Aileron Hinge Bolt

The FAA is superseding Airworthiness Directive (AD) 2012-06-16, which applied to all Pilatus Aircraft Ltd. (Pilatus) Model PC-6, PC-6-H1, PC-6-H2, PC-6/350, PC-6/350-H1, PC6/350-H2, PC-6/A, PC-6/A-H1, PC-6/A-H2, PC-6/B-H2, PC-6/B1-H2, PC-6/B2-H2, PC-6/B2-H4, PC-6/C-H2, and PC-6/C1-H2 airplanes.

AD 2012-06-16 required installing a new rudder and elevator locking screw and modifying the installation of the rudder and elevator hinge bolt. Since the FAA issued AD 2012-06-16, the European Union Aviation Safety Agency (EASA) superseded its mandatory continuing airworthiness information (MCAI) to correct an unsafe condition on these products. This AD does not retain any actions required by AD 2012-06-16 and requires inspecting and modifying the rudder, elevator, and right-hand (RH) aileron hinge bolt installations. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective January 25, 2022.

Supplementary Information: The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 to supersede AD 2012-06-16, Amendment 39-16997 (77 FR 19061, March 30, 2012) (AD 2012-06-16). AD 2012-06-16 applied to all Pilatus Model PC-6, PC-6-H1, PC-6-H2, PC-6/350, PC-6/350-H1, PC6/350-H2, PC-6/A, PC-6/A-H1, PC-6/A-H2, PC-6/B-H2, PC-6/B1-H2, PC-6/B2-H2, PC-6/B2-H4, PC-6/C-H2, and PC-6/C1-H2 airplanes and required installing a new elevator and rudder locking screw and modifying the installation of the elevator and rudder hinge bolt. The NPRM published in the Federal Register on September 17, 2021 (86 FR 51835).

The NPRM was prompted by AD 2021-0098, dated April 9, 2021 (referred to after this as “the MCAI”), issued by EASA, which is the Technical Agent for the Member States of the European Union.

The MCAI states:

  • Occurrences were reported where, on certain PC-6 aeroplanes, the elevator or the rudders was lost or partially detached during flight. All the occurrences happened on PC-6 aeroplanes in CONFIG 1.
  • This condition, if not corrected, could lead to in-flight failure of the elevator or rudder attachment, possibly resulting in reduced control of the aeroplane.
  • To address this potential unsafe condition, Pilatus issued SB 55-001 (original issue and Revision 1) to provide rework instructions for the elevator and rudder hinge bolt locking. Consequently, EASA published AD 2011-0230 to require this rework. Subsequently, Pilatus issued recommended SB 55-003 (later revised) to provide instructions to modify the hinge bolt installation of the elevator and rudder. This [service bulletin] SB, being recommended only, had no impact on the existing EASA AD.
  • Since that [EASA] AD and the recommended Pilatus SB 55-003 were published, the latest risk assessment determined that the modification of the hinge bolt installation of the elevator, rudder and right-hand (RH) aileron installation must be required to reach an acceptable level of safety for the affected aeroplanes. Consequently, Pilatus issued the SB, as defined in this [EASA] AD, to provide instructions to modify the affected aeroplanes into CONFIG 2 standard.
  • For the reasons described above, this [EASA] AD supersedes EASA AD 2011-0230 and requires, for certain aeroplanes, a one-time inspection of the elevator and rudder installation, followed by repetitive inspections of the elevator and rudder, and, depending on findings, accomplishment of applicable corrective action(s). This [EASA] AD also requires modification of the elevator, rudder and RH aileron hinge bolt installations into CONFIG 2, which is the terminating action for the repetitive inspections required by this [EASA] AD. Finally, this [EASA] AD prohibits (re)installation of affected parts.

You may examine the MCAI in the AD docket at https://www.regulations.gov by searching for and locating Docket No. FAA-2021-0786.

FMI: www.regulations.gov

Advertisement

More News

ANN's Daily Aero-Term (05.18.25): Flight Recorder

Flight Recorder A general term applied to any instrument or device that records information about the performance of an aircraft in flight or about conditions encountered in flight>[...]

Aero-News: Quote of the Day (05.18.25)

“We have the engine design; we have the integration plans for the launch airframe; we have the solutions to provide the hydrogen fuel; and we have the customers wanting to op>[...]

Classic Aero-TV: ELA Aviation Sports New Vertical Takeoff Gyroplane

From 2024 (YouTube Edition): Innovative Pitch Control Eliminates Runway Accidents Aero-News Network’s Rex Alexander spoke with Herbie Lewis of ELA Aviación, who discus>[...]

Airborne 05.19.25: Kolb v Tornados, Philippine Mars, Blackhawk Antler Theft

Also: Tentative AirVenture Airshow Lineup, Supersonic Flight Regs, Private Pilot Oral Exam Guide, Boeing Deal The sport aircraft business can be a tough one... especially when Moth>[...]

Klyde Morris (05.16.25)

Klyde Has No Patience... FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC