Brazilian AF To Upgrade Inspection Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Apr 08, 2018

Brazilian AF To Upgrade Inspection Aircraft

New Panels To Be Installed In Four Hawker 800XP Jets

The Brazilian Air Force Flight Inspection Group (GEIV) will be upgrading its fleet of Hawker 800XP aircraft with Rockwell Collins’ Pro Line 21 avionics suite that will bring them into compliance with upcoming airspace mandate requirements. This marks the first Pro Line 21 retrofit to be installed on a Hawker 800XP in Latin America.

“Pro Line 21 provides enhanced situational awareness and delivers a whole new flight experience for pilots,” said Marcelo Vaz, managing director for Rockwell Collins in Brazil. “The upgrade will also bring the Brazilian Air Force improved reliability over legacy avionics with lower maintenance costs over the long-term.”

The Pro Line 21 retrofit replaces legacy Cathode Ray Tube (CRT) displays with four large, configurable 10 x 8-inch liquid crystal displays (LCDs) that are capable of displaying high-resolution electronic charts, graphical weather, enhanced navigation maps, enhanced vision and other mission-specific options.

The four Hawker 800XP aircraft being upgraded are used by the GEIV to inspect and calibrate the air navigation aid, approach and landing equipment, as well as the high precision air navigation procedures. This helps provide safe operation to all aircraft flying within Brazilian air space during all flight phases, especially during adverse meteorological conditions. Existing components on the aircraft used for its mission, such as the flight inspection deck and sensors, will be fully integrated to operate within the new Pro Line 21 system.

(Image provided with Rockwell Collins news release)

FMI: www.rockwellcollins.com

Advertisement

More News

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

NTSB Prelim: Rutan Long-EZ

The Pilot Attempted Several Times To Restart The Engine And Diverted To Long Beach Airport/Daughtery Field On October 20, 2025, about 1603 Pacific daylight time, an experimental am>[...]

ANN's Daily Aero-Term (12.05.25): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (12.05.25)

"The latest development underscores the government of Malaysia’s commitment in providing closure to the families affected by this tragedy..." Source: From statements made by >[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC