ADs: Pratt & Whitney | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Jun 27, 2002

ADs: Pratt & Whitney

AD NUMBER:  2002-12-15
MANUFACTURER: Pratt & Whitney
SUBJECT:  Airworthiness Directive 2002-12-15
SUMMARY:  This amendment supersedes an existing airworthiness directive (AD), that is applicable to Pratt & Whitney PW4000 series turbofan engines. That AD requires operators to perform initial and repetitive inspections for cracking of high pressure compressor (HPC) front drum rotors based on cycle usage. That AD also requires the removal from service of any cracked HPC front drum rotors. This amendment clarifies inspection requirements for cracking of HPC front drum rotorsthat have fewer than 1,000 cycles-since-new (CSN). This amendment is prompted by comments from operators seeking more clarity about the inspection requirements of paragraph (a)(1) of that AD. The actions specified by this AD are intended to prevent HPC drum rotor failure from cracks that could result in an uncontained engine failure and damage to the airplane.

FMI: www.avantext.com/DailyADIndex.ASP?AD=20021215

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC