Weather Woes Push Dawn Launch To July 8 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Jul 05, 2007

Weather Woes Push Dawn Launch To July 8

And Even Then, It Ain't Lookin' Good

More weather woes for NASA, this time affecting its delay-plagued Dawn spacecraft. A lightning advisory near Kennedy Space Center Thursday morning forced the space agency to scrub its plans to begin fueling the second-stage of the probe's United Launch Alliance Delta II booster rocket.

The delay in fueling pushes the launch date for Dawn to July 8, one day later than previously scheduled. NASA will again try to fuel the second stage Thursday afternoon; if the weather remains a concern, fueling will be performed Friday.

Lightning wasn't the only concern at the Cape. Also Thursday morning, the temperature within the fairing caused the required temperature of the second stage to be too warm for fueling to begin. The fairing temperature is being lowered by 10 degrees so that oxidizer loading can begin Thursday afternoon, if weather is acceptable.

The launch window on Sunday, July 8, extends from 4:04 to 4:33 pm EDT... but the chance of not meeting the launch weather criteria on Sunday is 60 percent, according to NASA.

These latest delays are but the latest to strike the problematic Dawn spacecraft, which NASA hopes will eventually be sent into the heavens to study the twin asteroids Ceres and Vesta, between Mars and Jupiter. Cancelled by the space agency due to cost overruns in early 2006, before being reinstated one month later, Dawn's planned June launch date was already moved off once, after a crane used to stack segments of the Delta II booster broke down.

A worker's wrench also fell on the spacecraft's solar panel during a procedure to prepare the spacecraft for spin-balance testing, though it did not damage any cells.

FMI: http://dawn.jpl.nasa.gov/

Advertisement

More News

Airborne 05.10.24: Icon Auction, Drunk MedEvac Pilot, Bell ALFA

Also: SkyReach Parts Support, Piper Service Ctr, Airliner Near-Miss, Airshow London The Judge overseeing Icon's convoluted Chapter 11 process has approved $9 million in Chapter 11 >[...]

ANN's Daily Aero-Term (05.13.24): ILS PRM Approach

ILS PRM Approach An instrument landing system (ILS) approach conducted to parallel runways whose extended centerlines are separated by less than 4,300 feet and at least 3,000 feet >[...]

ANN's Daily Aero-Linx (05.13.24)

Aero Linx: FlyPups FlyPups transports dogs from desperate situations to fosters, no-kill shelters, and fur-ever homes. We deliver trained dogs to veterans for service and companion>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Airborne 05.08.24: Denali Update, Dad-Daughter Gyro, Lake SAIB

Also: NBAA on FAA Reauth, DJI AG Drones, HI Insurance Bill Defeated, SPSA Airtankers The Beechcraft Denali continues moving forward towards certification, having received its FAA T>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC